Pouring Down
in Motorways by Jon C — June 18, 2010 at 12:34 am | 0 comments
The final concrete closure pour on the new Mangere Bridge was successful last night.
This means the bridge will be one continuous piece of infrastructure 650 metres long from end to end.
Here are photos from Roger Kirk who was there:

Mangere bridge gets its last concrete pour



Tags: concrete Mangere bridge NZTA
0 Comments
You can be the first one to leave a comment.